porting capability of fills behind retaining walls, combine with spray-anchored concrete construction methods for slope maintenance (saving 30%-50% in investment and construction time), reduce bending and sinking of road bases and surfaces and delay crack formations (3-9 times), lessen structural layer thickness (up to 36%), and enable simple, fast construction (greatly reducing costs).