ACCC allows more time to develop wheat port capacity auction
date:May 11, 2012
The original timeframe of May 2012 to introduce an auction system will be extended to November 2012.


Viterra, the port terminal operator, is required by the undertaking to introduce an auction system in South Australia. Viterra has applied for more time to develop an auction system that addresses the problems that were highlighted by recent auctions in Western Australia.


ACCC chairman Rod Sims said the extended timeframe will provide Viterra and the industry with the opportunity to thoroughl
1/4 next page prev page home page last page
go back |  refresh |  WAP home |  Web page version  | login
04/05 04:06