aseptic filling machine
ced engineering and technical personnel to be responsible for the installation and commissioning of the equipment until the equipment is qualified to ensure that the equipment is in time and put into production;
2.Regular visits:To ensure the long-term stable operation of the equipment, we will be based on customer needs, provide one to three times a year to come to technical support and other integrated services;
3.Detailed inspection report: Whether the inspection regular service, or the annua
11/21 next page prev page home page last page
go back |  refresh |  WAP home |  Web page version  | login
01/11 05:10